Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms

Product Details
Customization: Available
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition: New
Still deciding? Get samples of US$ 100/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
16
Year of Establishment
2011-03-22
  • Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
  • Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
  • Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
  • Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
  • Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
  • Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Find Similar Products

Basic Info.

Model NO.
ZYS113
Drill Hole Depth
<10m
Bit Type
Diamond Bit
Drilling Way
Compound
Type
Four-Wheel Trailer
Product Name
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo
Dimension
17600X2900X3600 mm
Weight
52000kg
Model
Zys113
Power
325kw
Gradeablity
25%
Power of Drilling Rig
31.9kw
Transport Package
Nude
Specification
13300*3700*2700 mm
Trademark
CCC ISO9001
Origin
China
HS Code
84295100
Production Capacity
100unit/Month

Product Description

CONTACT
 

CRCHI ZYS113 Tunnel Excavation Drilling Rig Jumbo 
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms

I. Product Description
1. Name: Smart Three-boom Drilling Jumbo

2. Model:ZYS113

3. CRCHI's drilling jumbos are used for short-distance(50 m) exploration drilling and blast hole drilling in underground tunnelling. We offer jumbos with advanced technologies, such as multiple information fusion, 3D scanning, smart positioning, smart rig control, 50 m advance geological forecast and 30 m advance pipe shed construction. They can be widely used in different kinds of drifts, tunnels and culverts in fields like railways, highways, water conservancy, national defense for exploration and excavation.
 

II. Specifications

Items

Unit

ZYS 113
3 booms, Full computer type

ZYS82
2 booms, Full computer type

ZY113
3 booms, Semi-intelligent type

ZY82
2 booms, Semi-intelligent type

Total power

kW

325

215

295

185

Max. working section WxH

m

16.6x11.3

13.2x8

16.6x11.3

13.2x8

Min. Working section WxH

m

6x6

4x4

6x6

4x4

Max. Gradeability

%

25

     

Dimensions

mm

17600x2900x3600

15100x2500x3300

17600x2900x3600

15100x2500x3300

Model of drilling rig

/

3xHC110

2xHC110

3xHC109

2xHC109

Power of drilling rig

kW

31.9

31.9

18.5

18.5

Max. drilling depth

m

5.25

4

5.25

4

Drilling diameter

mm

φ41~φ140

     

Weight

kg

52000

33000

52000

33000


III. Details

Smart and precise positioning

  • An on-board scanner aids in achieving smart and precise positioning.

Highly effective and top quality drilling

  • Thanks to a computer system which allows to import blast hole graphs, automatic drilling is realized and there is no need to plot drill positions on the excavation area.
  • Drilling parameters like drilling angle, position and depth are controlled by the computer, ensuring accurate drilling.
  • The drill rigs with high power ensure fast drilling speed, with the max. drilling speed up to 3-5 m/min.

Advance geological analysis 

  • Thanks to a MWD system, 50 m advance geological analysis can be performed to optimize the blasting scheme.

3D contour scanning

  • The on-board scanner scans the contour of blast holes for 3D reconstruction to optimize the blasting design.

Comfortable and eco-friendly cabin

  • The closed and air conditioned cabin for a comfortable and quiet operating environment.
  • The cabin provides low noise level(≤78 dB) and low dust, beneficial for the operators.

High Informatization

  • The drilling jumbos can automatically record and store drilling logs and transmits data to the ground computer or mobile terminal through the network.

Highly adaptable

  • Suitable for various tunneling methods, such as full-face (including inverted arch) excavation, large cross section excavation and benching tunneling method.
  • Pipe shed operation at tunnel entrance and inside the tunnel can be achieved.
  • The automatic rod extension mechanism aids in achieving advance drilling.

IV. Other Models


Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three BoomsCrchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three BoomsCrchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms

IV. Our Company 

Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms
Crchi Zys113 Tunnel Excavation Drilling Rig Jumbo 11m Three Booms

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier