Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

Product Details
Customization: Available
Type: Crawler Excavator
Usage: Special Excavator, Marine Excavator, Mining Excavator, GM Excavator
Still deciding? Get samples of US$ 100/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
16
Year of Establishment
2011-03-22
  • Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
  • Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
  • Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
  • Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
  • Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
  • Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
Find Similar Products

Basic Info.

Model NO.
SE220
Bucket
Grab Shovel
Transmission
Hydraulic Transmission
Drive Type
Electric Drive
Bucket Capacity
1.0~1.5m³
Size
Medium-Sized
Certification
CE, ISO9001: 2000
Condition
New
Product Name
Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydrauli
Operating Weight
21.9ton
Stand Bucket
1.05m3
Engine
Cummins B5.9-C
Rated Power
112kw/1950rpm
Transport Package
Nude
Specification
9605x4915x3040mm
Trademark
CCC ISO9001
Origin
China
HS Code
842952120
Production Capacity
100unit/Month

Product Description

Contact:


SHANTUI SE220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator 
Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

I. Product Description
OVERALL WEIGHT
21900kg
BUCKET CAPACITY
1.05m³
ENGINE POWER
With 124kW/2050rpm, this engine conforms to China-II emission regulation.
 
II. Characteristic

a) Optional attachments

Breaking hammer, ripper, timber grab, stone grab, hydraulic tamper, quick change coupling, and breaking hammer pipeline.

 

b) Optional equipment of machine

Refueling pump; Cab warning lamp; Cab ceiling lamp; Cab overhead protective net; Cab front upper protective net; Cab front lower protective net; Rubber track; Narrow bucket

 

c) Spacious and comfortable operating environment

  •  The colors of the all-injection-molded interior trim parts are effectively matched as per ergonomics to mitigate the operator's visual fatigue.
  • The control devices are reasonably arranged to realize large space, broad vision, and convenient and comfortable operations.
  • The high-power A/C is installed and the adjustable wrist rest and the air cushioned seat are provided to help your all-day comfortable operations.

 

d) Intelligent electronic control and optimal power control

  • The intelligent control system realizes the optimal match between power system and hydraulic system to improve the working efficiency. The automatic idling function is provided to lower the fuel consumption and reduce the operating cost.
  • The man-machine friendly new generation intelligent electronic control system enables you to master all working status of your machine.
  • Four preset working modes of P (Heavy-Load), E (Economic), A (Automatic), and B (Breaking Hammer) feature easy switchover.

 

e) Drive sprockets, idlers, track rollers, carrier rollers, and tracks

  • Decades of R&D and manufacturing experiences of drive sprockets, idlers, track rollers, carrier rollers, and tracks and world's leading technologies.
  • The world's sophisticated forging and heat treatment processes guarantee stable and reliable quality.

 

f) Enhanced working device

  • The design of structural parts is comprehensive optimized and the critical load-carrying locations are reinforced to resist against severe working conditions.
  • The base plates, side plates, and reinforcement plates of bucket are made of high-strength wear-resistant material to improve the durability of bucket.
  • The booms, bucket arms, and buckets of diversified specifications can be combined easily to adapt to diversified working conditions.

 

g)High-end system configuration

  • Domestic leading high-adaptability engine
  • The world's first-class hydraulic configuration features high working pressure and low pressure loss.

III. Specifications
Comparative item SE220 (Standard version)
Overall dimensions  
Overall length (mm) 9605
Ground length (During transport) (mm) 4915
Overall height (To the top of boom) (mm) 3040
Overall width (mm) 2980
Overall height (To top of cab) (mm) 3070
Ground clearance of counterweight (mm) 1080
Minimum ground clearance (mm) 470
Tail turning radius (mm) 2925
Track length (mm) 4270
Track gauge (mm) 2380
Track width (mm) 2980
Standard track shoe width (mm) 700
Turntable width (mm) 2725
Distance from slewing center to tail (mm) 2920
Working range  
Maximum digging height (mm) 10100
Maximum dumping height (mm) 7190
Maximum digging depth (mm) 6490
Maximum vertical digging depth (mm) 5770
Maximum digging distance (mm) 9865
Maximum digging distance at ground level (mm) 9680
Working device minimum turning radius (mm) 2970
Maximum lifting height of bulldozer blade (mm) -
Maximum digging depth of bulldozer blade (mm) -
Engine  
Model Cummins B5.9-C (China-II)
Type Inline 6-cylinder, high pressure common rail, and water-cooled and turbocharged
Displacement (L) 6.7
Rated power (kW/rpm) 124/2050
Hydraulic system  
Type of hydraulic pump Duplex axial variable displacement plunger pump
Rated working flow (L/min) 2X213
Bucket  
Bucket capacity (m³) 1.05
Swing system  
Maximum swing speed (r/min) 11
Brake type Mechanically applied and pressure released
Digging force  
Bucket arm digging force (KN) 99/107
Bucket digging force (KN) 137/148
Operating weight and ground pressure  
Operating weight (kg) 21900
Ground pressure (kPa) 47.7
Traveling system  
Traveling motor Axial variable displacement plunger motor
Traveling speed (km/h) 3.3/5.1
Traction force (KN) 212
Gradeability 70%(35°)
Tank capacity  
Fuel tank capacity (L) 330
Cooling system (L) 28
Engine oil capacity (L) 20
Hydraulic oil tank/system capacity (L) 190/400

IV. Successful Cases

- CONSTRUCTION IN A CLAY MINE IN CHONGQING

Machine Type: Excavator

Project type: Mining

Construction Date: 2019.02.05

Working Condition: Mining, loading, transport

Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator


Shantui excavator is used for a clay mine in Chongqing for mining and breaking operations, with the daily average working time at 12 hours. SE470LC-9 hydraulic excavator is a new generation large-sized model of Shantui's excavator products, featuring strong power, super-high digging force among the products of same class, and reliable structure, and can bring about better operation experiences to the customers. The high-end hydraulic parts and the independently developed electronic control system are applied to realize good motion coordination and stable performances. The large cab of all-new design realizes a more spacious driving/riding space and good comfort for the driver and the exterior large-curvature rearview mirrors are installed to achieve broad working vision and high operation safety.
 

- SHANTUI EXCAVATOR FOR STONEWORK MINING IN GUANGDONG

Machine Type: Excavator

Project type: Mining

Construction Date: 2019.02.05

Working Condition: Mining, loading, transport

Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

 

One earthwork company in Guangdong presently owns more than 10 Shanti excavators, including six SE470LC-9, four SE370LC-9, and two SE245LC-9, mainly for the earthwork digging and mining operations, with the yearly maximum working time up to 6,000h per machine. Mr. Chen, the owner of this company, said that Shantui excavators are advantageous compared with his previous equipment in terms of stability, efficiency, and fuel consumption and especially highly praised Shantui's services.

 

- SE370-9 HYDRAULIC EXCAVATOR FOR RAILWAY CONSTRUCTION

Machine Type: Excavator

Project type: Road Constructions

Construction Date: 2020.03.11

Working Condition: Railway Widening


Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

Mr. Dou is a loyal excavator partner of Shantui in Xinjiang Uygur Autonomous Region. Upon receipt of the railway widening task from the government of Xinjiang Uygur Autonomous Region, he was aware of the need of numerous reliable high-tonnage excavators. In view of the strong power, high fuel economy, simple, flexible, and labor-saving operations, comfortable driving/riding environment, and simple repairs and maintenances and low costs of SE370LC-9 full-hydraulic excavators, he selected Shantui full-hydraulic excavators without any hesitation. Upon receipt, the machines were immediately put into the intense construction task and, which a short period of more than half month, have been working for >300 hours. With the comprehensive efficiency increased by 15% compared with traditional excavators and the advantages of reliable performances, high-end configuration, high availability, and timely caring services, Shantui's full-hydraulic excavators won the high recognition from the customer and created higher value for the customer.

V. Our Company

Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator
Shantui Se220 1.05m3 Bucket 112kw 21.9ton Hydraulic Crawler Excavator

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier